Jefferson Lab PAC 34

  Proposal Cover Sheet


Experimental Hall: 
Days Requested for Approval: 
This document must be received by close of business Monday, December 15, 2008 at:

Jefferson Lab
User Liaison
Mail Stop 12H5
12000 Jefferson Ave.
Newport News, Va
23606

Proposal Title:
 

Proposal Physics Goals:
Indicate any Experiments that have physics goals similar to those in your proposal.

Approved Conditionally approved, and/or Deferred Experiment(s) or proposals.
 
 
Contact person:
Name :
Institution :
Address :
Address :
City, State, ZIP/Country :
Phone :
Fax :
Email :
Spokespersons:
1.
2.
3.
4.
5.
6.
7.
8.
 
 
Contact person:(Jefferson Lab Use only.)
Recipient Date :
By :

LAB RESOURCES LIST

Jlab Proposal No.: Date

List below significant resources - both in equipment and human - that you are requesting from Jefferson Lab in support of mounting and executing the proposed experiment. Do not include item that will be routinely supplied to all running experiments such as the base equipment for the hall and technical support for routine operation, installation, and maintenance.

Major Installations (either your equip. or new equip requested from JLab)


  New Support Structures






Data Acquisition/ Reduction
  New Support Structures
  New Software
Major Equipment
Magnets :
Power Supplies:
Targets:
Detectors:
Electronics:
Computer Hardware:
Other:
Other:

BEAM REQUIREMENTS LIST

Jlab Proposal No.:        Date
Hall:   Anticipated Run Date    PAC Approved Days:
Spokesperson:
Phone:
Email:
Hall Liaison:

List all combinations of anticipated targets and beam considerations required to execute the experiment. (This list will form the primary basis for the Radiation Safety Assessment Document (RSAD) calculations that must be performed for each experiment.)

Condition No. Beam Energy (MeV) Mean Beam Current (µA) Polarization and Other Special Requirements (e.g. time structure) Target Material (use multiple rows for complex targets - e.g. w/windows) Material Thickness (mg/cm2) Est. Beam-On Time for cond. No. (hours)

The beam energies, EBeam, available are: EBeam = N x ELinac where N = 1, 2, 3, 4, or 5. ELinac = 800 MeV, i.e, available EBeam are 800, 1600, 2400, 3200 and 4000 MeV. Other energies should be arranged with the hall leader before listing.

HAZARD IDENTIFICATION CHECKLIST

Jlab Proposal No.:        Date
Check all items for which there is an anticipated need.
Cryogenics
beamline magnets
analysis magnets
target magnets
 type:
 flow rate:
 capacity:
Electrical Equipment
cryo/electrical devices
capacitor banks
high voltage
exposed equipment
Radioactive/Hazardous Materials
List any radioactive or hazardous/toxic materials planned for use:
Pressure Vessels
inside diameter
operating pressure
window material
window thickness
Flammable Gas or Liquids
  type:
  flow rate:
  capacity:
Drift Containers
  type:
  flow rate:
  capacity:
Other Target Materials
Beryllium (Be)
Lithium (Li)
Mercury (Hg)
Lead (Pb)
Tungsten (W)
Uranium (U)
*Helium (3He)
Other (List below)
Special Target Materials
*Helium (3He)
Deuterium
Vacuum Vessels
inside diameter
operating pressure
window material
window thickness
Radioactive Sources
permanent installation
temporary use
type:
strength:
Large Mech. Structure/System
lisfting devices
motion controllers
scaffolding or
elevated platforms
Lasers
  type:
  wattage:
  class:

  Installation:
  permanent
  temporary

  Use:
  calibration
  alignment
Hazardous Materials
cyanide plating materials
scintillation oil (from)
PCB's
methane
TMAE
TEA
photographic developers
other (list below)
General

Experiment Class

Base Equipment
Temp. Mod. to Base Equip.
Permanent Mod to Base Equipment
Major New Apparatus
Other:

Computing Requirements List

Proposal Title:


Spokesperson:     Experimental Hall:

Data:

Silo/Mass Storage (Tape):

Amount of Simulated Data Expected (TB):



Amount of Raw Data Expected (TB)    

Amount of Processed Data Expected:

Online Storage (Disk) Required (TB):

Imported Data Expected from Offsite Institutions:

Exported Data Expected to Offsite Locations:

Computing:

Simulation Requirements (SPEC CINT2000 hrs):

Production (Replay, Analysis, Cooking) Requirements (SPEC CINT2000 hrs):

Other Requirements
Please add any additional information that will be useful for JLab's Information Technology group regarding unique configurations or that may require additional resources and/or coordination. Please indicate if possible what fraction of these resources will be provided by collaborating institutions and how much is expected to be provided by JLab.